Report optimistic for future development of Western Rail Corridor

placeholder image

The success of the new Athenry to Ennis section of the Western Rail Corridor was highlighted in a new report

LAUNCH Minister of State for Rural Affairs, Michael Ring, TD, pictured at the launch of the Cicero Report on Phase 1 of the Western Rail Corridor at Ireland West Airport Knock with Minister of State SeΡn Canney, OPW and Flood Relief, Western Development Commission Chairman Paddy McGuinness, ColmΡn Ó Raghallaigh, West on Track, Claremorris (report sponsors) and Ireland West Airport Knock Manager Joe Gilmore.

Passenger numbers double on Galway to Limerick route

Austin Garvin

The success of the new Athenry to Ennis section of the Western Rail Corridor was highlighted when a report from Cicero Communications, Galway was presented to a large audience at Ireland West Airport, Knock last week.

Michael Ring, TD, Minister for Regional Economic Development, launched the far reaching report. Other public representatives in attendance included; Mr SeΡn Canney, TD, Minister of State, OPW Flood Relief; Senator John O’Mahony, Senator Michelle Mulherin, Senator Rose Conway/ Walsh and councillors from the adjoining counties.

Mr Joe Gilmore, CEO Ireland West Airport Knock, welcomed everyone to the launch.

Also in attendance were representatives of DFDS Logistics (rail hauliers) and Waterford Port together with members of West on Track.

Mr Kealan Flynn, Cicero Communications, Galway said research conducted by his company for West on Track, with the co-operation of Iarnród Éireann, found that passenger numbers far exceeded projections and that traffic on the Galway-Limerick route is growing at a faster rate than on any other route in the country.

Mr Flynn pointed out that the new Athenry to Ennis section (Phase One) of the Western Rail Corridor carried 102,000 passengers in 2015, which is more than double the numbers carried in 2014 and far exceeding Iarnród Eireann forecasts in the original business case for the re-opening of the Galway to Limerick passenger train service.

Overall, the Galway to Limerick route carried more than 300,000 passengers in 2015.

The Cicero findings are further confirmed in the recent publication of the National Rail Census by the National Transport Authority which found 1147 journeys took place on the Galway-Limerick Rail service on Rail Census Day 2015.

Infrastructure needed

Launching the report, Michael Ring, Minister for Regional Economic Development confirmed that the process of bringing a major plan together for an Atlantic Economic Corridor was well underway and that he hoped to be in a position to announce details of the plan by December.

He confirmed that the Mayo-Galway rail link, the next phase of the Western Rail Corridor was among the projects that would be actively considered. “Like everybody else in the west of Ireland I believe we have enough reports. We now need to put infrastructure of all kinds into the west,” he said.

SeΡn Canney, TD, Minister of State OPW, said he was working closely with Minister Ring and other colleagues to ensure that the Atlantic Corridor becomes a reality. “The restoration of the Mayo-Galway rail link is a key part of that as far as I’m concerned,” he said.

Referring to the numbers using Phase One of Western Rail Corridor from Ennis to Athenry, Minister Canney stated, “These numbers exceed the original business case and put to bed the myth that the Western Rail Corridor is a white elephant.”

He added that he was pleased to confirm that the TII was writing to Galway County Council to confirm that a new railway bridge is to be built at Ballyglunin as part of the works on the new M17 motorway.

Mr Paddy McGuinness, Chairman of the Western Development Commission, said the sponsors of the report, West on Track, is a group of highly principled and well-motivated individuals who have campaigned for many years for the re-opening of the rail line from Limerick to Sligo.

“They have conducted the campaign in an exemplary manner - at all times showing respect to others - often in the face of unseemly ridicule from opponents of the campaign. They have paid for this study out of their pockets. They deserve our respect and gratitude,” he said.

Mr McGuinness stated that a recent study by the Western Development Commission identified potential for a four-fold growth potential in rail freight traffic in Mayo that currently stands at over 1,100 freight trains from Mayo annually.

A West on Track Spokesperson said: “The renewal of the Mayo—Galway railway will facilitate this potential growth and further boost passenger and tourism development on the west coast. It is now time to acknowledge the success of the Galway to Limerick rail services and move quickly to improving them further by renewing the Government commitment to complete phase 2, linking Mayo and Galway. Iarnród  Eireann’s projected passenger demand is 66 per cent greater between Galway and Mayo than between Galway and Limerick,” he concluded. Liamy MacNally was MC for the event.

Powered by
Register
Follow us
© 2026 Formpress Publishing LTD. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice