North Mayo landscape will 'absorb' new 22 turbine wind farm


An Coimisiún Pleanála granted planning permission for Glenora Wind Farm despite concerns regarding its impact on the landscape
AN inspector with An Coimisiún Pleanála found that a proposed windfarm for north Mayo will absorb into the landscape including sensitive heritage sites such as the Céide Fields.
An Coimisiún Pleanála granted planning permission to SSE Renewables and FuturEnergy Ireland for the for the development of Glenora Wind Farm in north Mayo which will have a projected export capacity of up to 158MW.
The wind farm will comprise of 22 onshore wind turbines with a total blade tip height of 180 metres which are to be installed on a site in Glenora, located around 7km southwest of Ballycastle and 6km southeast of Belderrig.
Concerns had been raised by local residents and public representatives regarding the location and the size of the wind turbines and their impact on the local landscape. There were concerns raised that they will have a negative impact on Downpatrick Head and on the Céide Fields UNESCO world heritage site.
However, Bríd Maxwell, Inspector with An Coimisiún Pleanála addressed these concerns in her planning report and felt the 'landscape has the capacity to absorb the development'.
“The proposed windfarm will not detract from the setting and context of the sensitive heritage sites including the Céide Fields, Downpatrick Head, the Wild Atlantic Way and designated sites. The cumulative impact of the proposed development in combination with other permitted and proposed developments has been taken into consideration. It is my considered view that while the proposed development will constitute a significant intervention in the landscape resulting in impacts from a number of receptors and viewpoints, the landscape has the capacity to absorb the development,” she stated.
There were also concerns raised regarding the impact the windfarm will have on potential future land use and the difficulties in securing planning permission for residential development. However, Ms Maxwell stated that having considered these concerns she was satisfied that given the isolated location of the proposed development, 'there is no likely effect on the implementation of rural housing policy'.
In approving planning permission for the Glenora Wind Farm, the Commission of An Coimisiún Pleanála found that it will make a positive contribution to Irelands national strategic policy on renewable energy and its move to a low carbon future. They also added that the location of the turbines was considered to have an acceptable impact on the environment and on the amenities of the area.
Welcoming the decision, SSE and FuturEnergy Ireland stated that the final delivery of the Glenora Wind Farm will be subject to the project securing planning consent for associated grid infrastructure and a grid connection, as well as a commercial route to market and final investment decisions.
Ghislain Demeuldre, Head of Onshore Wind, Solar and Battery Development at SSE Renewables, said: “Mayo and the North-West is home to an extraordinary wind energy resource. This decision marks another step forward for the project and the SSE-FuturEnergy Ireland portfolio. Glenora Wind Farm has the potential to bring huge economic benefits to North Mayo through job creation, community benefit funding and commercial rates payments to Mayo County Council.”
Glenora Wind Farm is a 50:50 co-development project between SSE Renewables and FuturEnergy Ireland and part of a co-development portfolio consisting of six projects in Donegal, Cork, Kerry and Mayo. Included among these projects are the proposed 18-turbine Sheskin South Wind Farm near Bangor Erris which was granted planning consent in March 2024.